Development Timeline

  1. March 2023

    Proof of Concept 1/4
    Developed initial Python code to fly a Cessna 152 in the X-Plane simulator, validating core control functions.

  2. May 2023

    Proof of Concept 2/4
    Ported the control code to a development board interfaced with the X-Plane simulation, strengthening hardware-software integration.

  3. July 2023

    Proof of Concept 3/4
    Integrated the system into an off-the-shelf UAV airframe fitted with custom sensors, boards, and actuators.

  4. February 2024

    Flight test campaign:
    First real-world flight tests. Early setbacks, including several crashes, provided critical insights for system tuning.

  5. June 2024

    Major milestone: production of our first ARM-based flight controller, a two-stage board with advanced navigation units that forms the foundation of a robust avionics platform.

  6. August 2024

    Proof of Concept 4/4:
    First 3D-printed airframe prototypes built and validated in flight. The CoraX UAV entered its test phase.

  7. December 2024

    On Christmas Day, CrossHair AvioniX achieved a major breakthrough: its first successful waypoint mission and automatic landing, flown in the field on our test UAV.

  8. 2025

    Extensive testing on the 2 m and 1.5 m CoraX platforms, covering autonomous takeoff and landing, waypoint navigation, geofencing, return-to-home, and loiter.

  9. 2026

    Product lineup and P1400:
    Defined the CoraX product lineup and initial concepts of operations (CONOPS). Designed and manufactured several prototypes of the entry-level P1400 UAV.

  10. Next steps

    Where we are heading:
    Complete the Horus ground control station, scale CoraX into a fully operational UAV company, and certify the P1400 platform.